KIPP KSJC | DSA Modular Upgrade and Closeout
Project Executive: Doug Giffin
Project Manager: Nicolas Romano
Project Sponsor:
KIPP Public Schools
School Operators:
KIPP KSJC (9-12)
Construction Type: Portable classrooms
Project Delivery Method: Design-Bid-Build
Contractor: Swenson Builders
Architect: McKim Design Group
Size: 4,320 SF on an existing school campus
Status: Completed summer 2023
Total Project Cost:
$1.77M ($463/SF) hard and soft cost
Campus assisted KIPP in completing the last phase of a modernization project at their San Jose Collegiate campus.
The project involved the conversion of existing classrooms to science lab and art space. Campus worked with the design team to entitle a scope reduction through the DSA, saving KIPP money on an unnecessary drop off location that had been present in the original drawings.