Aspire RCAL + Summit Tam | Shared Campus

Project Executive: Doug Giffin

Project Manager: Nicolas Romano

Project Sponsor: 

Steve and Susan Chamberlin

School Operators: 

Summit Tam (7 – 12) & Aspire RCAL (6 – 12)

Max Enrollment: 1,400 students

Construction Type: Tilt-up concrete

Project Delivery Method: Design Build MEP

Contractor: Big-D Construction

Architect: Studio Bondy Architecture

Structural Engineer: SEI

Size: 134,375 SF in three buildings on 8.4 acres

Status: Phased delivery completed fall 2015/2016

Total Project Cost: 

$27.9M ($208/SF) hard and soft costs

Campus managed all aspects of the project development including land acquisition, design, entitlement, and construction.  We leveraged existing zoning permitting schools without a use permit to receive streamlined city approvals and deliver the project 21 months after land acquisition and the start of preliminary design.  The total project cost of $208 per square foot not including land was less than half of that being spent on nearby school projects at the time.

 

 

 

The quality of our projects is well demonstrated by how this project has held up to years of use by two separate schools. Contact us for a tour.