Aspire Rosa Parks | Site Upgrade and Modular Addition
Project Executive: Doug Giffin
Project Manager: Nicolas Romano
Project Sponsor:
Aspire Public Schools
School Operators:
Aspire Public Schools (TK-8)
Max Enrollment: 90 students
Construction Type: Portable classrooms
Project Delivery Method: Design-Bid-Build
Contractor: Jose Jimenez
Architect: Artik Art & Architecture
Size: 2,880 SF on an existing school campus
Status: Completed spring 2023
Total Project Cost:
$465,000 ($161.45/SF) hard and soft costs
Campus managed the addition of portable classrooms to the Rosa Parks site to accommodate additional required TK classrooms for the school. Campus worked with the local school team to determine the optimal configuration for the portables, and then worked with the City to gain approval and design review for the classrooms.
Campus managed all aspects of the project development including land acquisition, design, entitlement, and construction.